Skip to content

Guide checkpoint restore from project history - #59

Merged
haphantran merged 2 commits into
mainfrom
feature/guided-checkpoint-restore
Nov 27, 2026
Merged

haphantran merged 2 commits into
mainfrom
feature/guided-checkpoint-restore

Conversation

@haphantran

Copy link
Copy Markdown
Collaborator

Changes

  • Add an owner workflow to preview and confirm a checkpoint restore from Project History.
  • Check both reviewed hashes, save a pre-restore recovery checkpoint, and verify the restored graph before committing.
  • Scope restore writes to the selected project. Reload the workspace and link to the saved recovery checkpoint.
  • Preserve the existing REST restore contract.

Verification

  • 446 frontend tests and 725 local backend tests passed, with two PostgreSQL cases enabled in CI.
  • Production frontend build and desktop and mobile browser smoke tests passed with fixture data.
  • PostgreSQL integration tests exercise stale-preview rejection, recovery, and rollback on a cross-project artifact conflict.

@haphantran
haphantran merged commit 6f9acf2 into main Nov 27, 2026
3 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant