Skip to content

Fail oversized activity and entity completions instead of abandoning and re-executing them #202

Backlog

Description

@andystaples

Problem

When an activity result or entity batch result exceeds the DTS service's gRPC receive limit (4 MiB by default), the service rejects CompleteActivityTask or CompleteEntityTask with ResourceExhausted: Received message exceeds the maximum configured message size. The worker never completes the work item, and the activity or entity operations re-execute indefinitely. The calling orchestration stays RUNNING with no failure surfaced.

Observed behavior against the DTS emulator:

Case Behavior
Activity returns 5 MiB Activity re-executes about every 56 s; orchestration stays RUNNING
Five queued entity calls, each returning 1 MiB (combined batch result over 4 MiB) All five operations re-execute about every 56 s; callers wait forever
One entity call returning 5 MiB Same as above
Orchestration output of 5 MiB Fails cleanly with OrchestratorResponseTooLarge (no loop)
Orchestration input of 5 MiB ScheduleNewOrchestration fails immediately with ResourceExhausted (no loop)

The poisoned work items also outlive the worker: they are redelivered to the next worker that connects.

Cause

  • Only orchestration responses are bounded on the worker (about 3.9 MiB; oversized responses become a non-retriable OrchestratorResponseTooLarge failure). Activity and entity completions are sent unchecked.
  • isTransientWorkerGRPCStatus (client/grpc_worker.go) treats ResourceExhausted as fatal only when the message uses gRPC-Go's local wording ("received message larger than max" / "trying to send message larger than max"). The service's wording doesn't match, so the completion RPC is retried 10 times with backoff (about 55 s), after which the worker abandons the work item (abandonActivity / abandonEntity in client/grpc_worker_processor.go) and the service redelivers it.

#198 intentionally left activity and entity completions unchecked to match .NET. The .NET worker has the same loop (microsoft/durabletask-dotnet#848), so parity doesn't avoid it: an orchestration should never be left stuck because a completion can never be accepted.

Proposed behavior

  • After large-payload externalization, check activity and entity completions against the same bound used for orchestration responses.
  • Replace an oversized activity completion with a non-retriable failure (for example ActivityResponseTooLarge), so the orchestration receives TaskFailed and the activity isn't re-run.
  • Replace an oversized entity batch completion with a batch failure that omits partial state and results (for example EntityResultTooLarge), so the calls fail and the entity state is unchanged.
  • Treat a service-side ResourceExhausted "message size" rejection of a completion as non-retriable rather than transient, so it doesn't spend about 55 s in retries.
  • Consider exporting the new error types next to api.ErrorTypeOrchestratorResponseTooLarge.

The in-memory test backend in durabletasktest (#183, #188) fails oversized completions on the host side so tests fail promptly; this issue tracks the worker behavior against DTS.

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Projects

    No projects

      Milestone

      No milestone

      Relationships

      None yet

      Development

      No branches or pull requests

      Issue actions