Skip to content

chore: prepare Amber 2.0.0-beta.11 - #1453

Merged
crimson-knight merged 1 commit into
v2-devfrom
release/2.0.0-beta.11
Nov 20, 2026
Merged

crimson-knight merged 1 commit into
v2-devfrom
release/2.0.0-beta.11

Conversation

@crimson-knight

Copy link
Copy Markdown
Member

Version, release notes and docs for beta.11.

Checked locally (crystal-alpha 1.21.0, macOS arm64): an app generated by the Amber CLI 2.0.11 branch with v2-dev at 6b51844, Grant v0.24.0 (7bb4b9d4) and asset_pipeline v0.38.0 (73c89c34) shows 0 pcre2 lines in otool -L and 0 pcre2_ symbols in nm, before and after amber generate scaffold Pet ...; the scaffolded app's specs pass (12 examples, 0 failures). scripts/check_beta_contract.sh and crystal tool format --check pass.

Version 2.0.0-beta.11 in shard.yml and Amber::VERSION, the beta.11 changelog
section dated, release notes, and docs that name Amber CLI 2.0.11. The
changelog covers #1451, #1452, and the default amber new app that links no
PCRE2 with Grant 0.24.0 and asset_pipeline 0.38.0.
@crimson-knight
crimson-knight merged commit f987f1b into v2-dev Nov 20, 2026
7 checks passed
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant