2 changes: 1 addition & 1 deletion docs/build-plan.md
Original file line number Diff line number Diff line change
Expand Up @@ -197,7 +197,7 @@ Exit criteria:
- [ ] Each week, record false positives, overrides, bypasses, failed runs by reason, egress blocks and cost per run. Keep cost numbers (any currency amount) in the owner's private notes and the Anthropic Console, never in this public repo. Public text may give ratios and timing only.
- [ ] Fix false positives in prompts or code. Each fix goes through phase 2 again, then ships as in "Each release" below.
- [ ] Keep the fixture eval results as an artifact: `eval.yml` uploads none today, so a release eval's per-case results exist only in the job log (phase 2 run 40445885087 and phase 3 run 40528717338 were read from logs). Ships as in "Each release".
- [ ] Plan publication before writing: bounded continuation comments, pointed to from the sticky summary, hold every summary-only finding (changed keys, unverified, outside the diff) when one comment cannot. Then no explanation is cut from the PR comments and summary capacity no longer fails a run whose computed result is `pass` (spec "Publishing (code)", size limit residual; review r-p3-cut-final Important 1). Keep the fail-closed check until this path is complete. Ships as in "Each release".
- [ ] Plan publication before writing: bounded continuation comments, pointed to from the sticky summary, hold every summary-only finding (changed keys, unverified, outside the diff) when one comment cannot. Then no explanation is cut from the PR comments and summary capacity no longer fails a run whose computed result is `pass` (spec "Publishing (code)", size limit residual; review r-p3-cut-final Important 1). Keep the fail-closed check until this path is complete. Ships as in "Each release". Plan (planned, not built): [docs/continuation-comments-plan.md](continuation-comments-plan.md).

Depends on: phase 3.